except for the Orbital Workshop (OWS) repairs completed by Skylab two and Skylab three, all of the Skylab EVAs have been performed in connection into the plan routine maintenance completed on the Apollo Telescope Mount, https://zoefrqc349873.liberty-blog.com/30060439/getting-my-space-apollo-ring-to-work